Skip to main content
24/7 emergency electricians across the Gold Coast

QLD Lic. No. 00000

Mon to Fri 7am to 5pm

voltone@vectorr.com.au

Switchboard upgrades on the Gold Coast

Old fuse boards are the most common reason Gold Coast homes trip power, fail inspections and struggle with EV chargers, air conditioning and induction cooktops. We replace them with a compliant switchboard fitted with RCD safety switches, surge protection and room for the circuits you will add next.

From $1,490

Typical starting price

4 to 6 hours

Most single-phase homes

Certified

Testing and safety certificate

12 months

Workmanship warranty

Licensed, accredited and insured

Master Electricians

Electrical Safety Office

Clean Energy Council

Tesla Powerwall Certified

Signs your switchboard needs upgrading

Most homes built on the Gold Coast before the mid-1990s still run on their original board. If any of these sound familiar, it is time for an electrician to take a look.

Ceramic fuses or rewireable fuse wire in the meter box
Power trips when the oven, dryer or air conditioner run together
No RCD safety switches, or one switch protecting the whole house
Scorch marks, buzzing or a warm smell around the board
You are adding an EV charger, solar battery, pool pump or induction cooktop
A building inspection or pre-sale report has flagged the board

What's included in a switchboard upgrade

Every upgrade is scoped to your home, but most include the following.

New switchboard enclosure

A modern board with labelled circuit breakers and spare capacity for future circuits.

RCD safety switches

Safety switches on every power and lighting circuit, as required for new work in Queensland.

Surge protection

A whole-of-home surge diverter to protect appliances through Gold Coast storm season.

Meter box and Energex booking

We replace the meter panel where needed and book Energex to disconnect and reconnect supply.

How much does a switchboard upgrade cost on the Gold Coast?

Most single-phase homes land between $1,490 and $2,400. The final price depends on how many circuits you have, whether the meter box needs replacing, the condition of the existing wiring and whether Energex needs to attend. You get a fixed written price on site before any work starts.

RCD safety switch retrofit

Add safety switches to an existing modern board

from

$450

Switchboard replacement

Single-phase, up to 8 circuits with RCDs

from

$1,490

Switchboard and meter box

New enclosure, meter panel and Energex booking

from

$2,400

Three-phase upgrade

For EV chargers, ducted air and workshops

from

$3,500

Prices include GST, materials, testing and certification.

Our switchboard upgrade process

01

Inspect and quote

We test your existing board and circuits, then give you a fixed written price.

02

Book the changeover

We schedule a time that suits you and coordinate Energex if the supply needs isolating.

03

Install and test

Power is off for four to six hours while we fit and test the new board.

04

Certify and hand over

You receive a Certificate of Testing and Safety and a labelled circuit chart.

Standards and compliance

All work is carried out by A-grade licensed electricians to AS/NZS 3000 (the Wiring Rules) and Queensland Electrical Safety Office requirements. We notify the network where required and issue a Certificate of Testing and Safety for every upgrade.

Fixed-price quote

Get a fixed price for your switchboard upgrade

Send a few details and photos of your board. We reply within the hour in business hours.

Or call 07 5550 1420

Power out or the board is sparking?

Switch off at the main if it is safe to do so and call our 24/7 line on 07 5550 1420.

Recent jobs

Switchboard upgrades we've completed

View all projects

Reviews

What clients say about our switchboard work

Read all reviews

“Fixed price, on time and spotless. Exactly what you want from a sparky.”

Replaced our old fuse board with a new switchboard and safety switches in one morning. Clear advice and no upselling.

Daniel K.

Upper Coomera · Switchboard upgrade

“They sorted Energex for us, which was the part I was dreading.”

Our meter box needed replacing too. Volt One booked the disconnection, did the work in a day and sent the certificate that night.

Priya R.

Southport · Board and meter box

“Finally able to run the dryer and the air con at the same time.”

Explained exactly why the old board kept tripping and what the new one fixes. Tidy job and great communication.

Mark T.

Helensvale · Switchboard upgrade

FAQs

Switchboard questions

The questions we hear most before a switchboard upgrade.

How much does a switchboard upgrade cost on the Gold Coast?

Most single-phase homes land between $1,490 and $2,400. A board and meter box replacement typically starts around $2,400, and three-phase upgrades from $3,500. You get a fixed written price before we start.

How long will my power be off?

Usually four to six hours for a standard single-phase upgrade. We tell you the exact window when we book, and can stage the work so your fridge is off for as little time as possible.

Do I need a new switchboard to install an EV charger?

Not always. Many modern boards have room for a dedicated EV circuit. Older boards with ceramic fuses, or homes on a small supply, usually need an upgrade first. We check this as part of the EV charger quote.

Are safety switches compulsory in Queensland?

Any new or altered circuit must be protected by an RCD, and Queensland rental and sale rules require safety switches on power circuits. We recommend RCDs on every power and lighting circuit.

Will Energex need to attend?

If the meter box or main supply needs to be isolated, yes. We book Energex for you and coordinate the timing so you only deal with one trade.

Is the upgrade covered by a warranty?

Yes. All workmanship carries our 12-month warranty, and the switchboard components carry the manufacturer warranty.

Get in touch

Ready to replace your old switchboard?

Send us a photo of your board and we will come back with a fixed price, usually within the hour.

Concept site by Vectorr Back to vectorr.com.au
Built in Breakdance